> ## Documentation Index
> Fetch the complete documentation index at: https://docs.palagus.ai/llms.txt
> Use this file to discover all available pages before exploring further.

# Models per project

Your plan sets how many AI models each project measures on. Each project has its own set of models, and its prompts run on those models.

## The project's models

* A project measures on at least one model and at most the number your plan includes.
* You choose the models in the project's settings, on the **Configure** step.
* A model that is not offered in the project's country cannot be chosen.

## How prompts use them

* A new prompt starts with all of the project's models that are still offered. You can leave single models out for that prompt.
* A prompt cannot use a model the project does not have.
* An archived prompt can be activated again only if its models are still models of the project.

## Changing the project's models

* **A model you add** joins every prompt of the project. It is measured from the next scheduled measurement.
* **A model you remove** leaves every prompt of the project. Its results stay findable in the **Models** filter.
* If removing a model would leave a prompt without any model, the change is refused. Archive that prompt first, or add another model in the same change.
* A model the project already measures on keeps measuring, also when it is no longer offered for new choices. You can remove it, but not choose it again.

## Room for more models

A larger plan does not add models to a project on its own. Right after you change to a plan with more models, the **Billing** tab says how many models per project your plan now includes, and how many more than before. When your plan includes more models than a project measures on, the project's settings say how many you can add. Add them on the **Configure** step.

## Fewer models in your plan

To change to a plan with fewer models, every project must fit first. On the **Billing** tab, **Too much for this plan** names each project that measures on more models; its name opens the project's settings. Remove a model there, on the **Configure** step, then change the plan.

Without a plan, you cannot add models to a project. Removing models stays possible.

## Restoring an archived project

An archived project comes back only if it fits your plan: its prompts must fit into your plan's prompt limit, it may not measure on more models than your plan includes per project, and it may not be measured more often than your plan allows. Measuring less often is fine. If it does not fit, the message says what is too much; extend your plan to restore it.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.